¿´Æ¬ÊÓƵ

News

POWER SHUTDOWN: February 3

Published: 31 January 2007
Please be advised of power shutdowns affecting the buildings listed below on Saturday, February 3, starting at 10:00 a.m. (10 minutes per building). These shutdowns are necessary to transfer each building from one electrical line to another as part of the project to upgrade the electrical distribution in the South West Sector of the downtown campus: • Ferrier • Power House. For information, please contact François Turcotte at ext. 8806 or David Balcombe at ext. 5849.
Back to top