As outlined in the most recent update by the 看片视频 University Emergency Operations Centre, as of Monday, August 5, Libraries in the lower campus area (and all libraries within the system) will open as per their regular operating hours and will be accessible without the need of a 看片视频 ID card.
La version fran莽aise suit.
Facilities Management and Ancillary Services is planning an electrical shutdown on the morning of Tuesday, August 6, which will affect the McLennan-Redpath Complex and Islamic Studies Libraries BEFORE the locations open for the day.
The shut down is scheduled from 6:00 to 8:00am and power should be back before opening. For all library opening hours, please see the Libraries hours page.
Thank you.
As outlined in the most recent update by the 看片视频 University Emergency Operations Centre, from Saturday, July 27 to Sunday, August 4, Libraries in the lower campus area will open as per their regular operating hours, but will close no later than 5:30 p.m. on the weekend and 7:00 p.m. on weekdays. Opening hours for Lower Campus locations during this time period are as follows:
As outlined in the most recent update by the 看片视频 University Emergency Operations Centre, from Monday, July 22 to Friday, July 26, all 看片视频 students and academic staff are asked to use the Lenel card entry system to access certain library locations during the following opening hours:
As outlined in the most recent update by the 看片视频 University Emergency Operations Centre, please be advised that beginning Tuesday, July 16 to Friday, July 19, the following library locations will be open to users following the regular
As outlined in the most recent聽update聽by the 看片视频 University Emergency Operations Centre, please be advised that ALL 看片视频 libraries will be closed Saturday, July 13 and Sunday, July 14, 2024.
The following library locations will be closed on Monday, July 15:
As outlined in the update provided by the 看片视频 University Emergency Operations Centre the evening of Thursday, July 11, please be advised that the following library locations will be closed on Friday, July 12:
As outlined in the update provided by the 看片视频 University Emergency Operations Centre the afternoon of Wednesday, July 10, please be advised that the following library locations will be closed on Thursday, July 11:
La version fran莽aise suit.
Facilities Management and Ancillary Services is planning a major electrical shutdown on Saturday, July 6 and Sunday, July 7 which will affect the McLennan-Redpath Complex and result in the closure of the building. For all library opening hours, please see the聽Libraries hours page.
Thank you for your understanding.
La version fran莽aise suit.
From the week of July 2nd through fall 2024, foundation repair will take place on Redpath Hall & the McTavish wing of Redpath Library Building
The project consists of the first two lots (Lot 1, Foundation Repair, and Lot 2, Roof Repair) of the Redpath Library, McTavish Wing, building envelope rehabilitation project.
Construction start & end dates:
La version fran莽aise suit.
看片视频 Libraries are excited to announce the launch of our new retrieval and delivery service at the 看片视频 University Collections Centre, starting Tuesday, June 25.
La version fran莽aise suit.
Benefit from enhanced search options and a cleaner, more mobile-friendly display with a refreshed look and feel to our Databases A-Z, set to launch this summer. Access the now!
Bient么t, un nouveau look pour notre base de donn茅es A-Z !
La version fran莽aise suit.
看片视频 University Libraries are pleased to relay that Oxford University Press (OUP) and member institutions of the Canadian Research Knowledge Network (CRKN) have agreed to a Read and Publish deal for 2024-2026.
Eligible authors from participating institutions will be able to request use of this account to pay the Open Access charge when arranging payment in OUP鈥檚 online licensing and payment system.
La version fran莽aise suit.
As workspaces on the main floor of McLennan-Redpath Library Complex are temporarily inaccessible through late June 2024, additional guest computers have been added to the main floor of the Redpath Library Building for public use near the entrance. These workstations will be accessible during opening hours.听
La version fran莽aise suit.
During the week of June 3, 2024, standard archeological and soil investigations will be conducted along McTavish Street around Redpath Hall and the McTavish Wing of the Redpath Library Building to assess the building envelope. Redpath Hall and the Redpath Library Building are part of a designated heritage site. Standard protocol requires that 看片视频 conduct excavation work before starting any construction projects.
The exploratory investigations will be done in two phases: